SERVICES

POWER GENERATION

alt text

Our company has been working successfully in the fields of Energy, since the establishment date. We have constructed hundreds of transmission projects and thousands of kilometers of transmission lines for public and private clients. We offer high quality equipment with long period guarantee and install it by the request of the clients.

  • Power Generation
  • Power Transmission and Distribution
  • Installation of Electrical Equipment
  • Assemble and Adjustment of Electrical Shovel Excavators
  • Solar Power
  • Wind Power

Our capability

  • In 2000-2002, GP replaced barely all oil circuit breakers by vacuum breakers for energy and mining field of Mongolia.
  • In 2002, GP installed and constructed the coal handling plant, substation of 110/35kV, fuel storage tank in frame of Baganuur and Shivee-Ovoo coal mine development project.
  • In 2005, GP worked as main constructor of 100kWh wind power generator in Erdenetsagaan soum, Sukhbaatar Province of Mongolia.
  • In 2006, GP installed 30 km long high voltage transmission lines and 110/6.3kV substation upon request Shivee-Ovoo coalmine and Toson Alt LLC.
  • In 2009, GP supplied and installed distribution facility of 6.3kV for steam turbine generator in Erdenet city.

Our capability

GP provides your required electrical and mechanical equipment and machineries from public and private manufactureres of China, Russia, Japan, Germany, Australia and USA. We have many international partners with high reputation and honors that manufacture high quality equipment. Our skillful engineers install and assemble the provided equipment and would be responsible for after sales service for you, if required. GP has licenses on conducting following services.

  • Installation, Erection, Maintenance and Service of power generators in the range of capacity 0.1-5 MW.
  • Installation, Erection, Maintenance and Service of electricity transmission lines and substations with 0.4-35 kV.
  • Maintenance, Installation, Adjustment and Service of pressurized boilers of 0.7-40.0 kgf/cm².
  • Maintenance, Installation, Adjustment and Service of pressurized pipelines of 0.7-40.0 kgf/cm² and Central Heating System.
  • Maintenance, Installation, Adjustment and Service of pressurized vessels of 0.7-40.0 kgf/cm².
  • Maintenance, Installation, Adjustment and Service of facilities of under 40.0 kgf/cm².

MINING

alt text

Grand Power LLC signed a contract with Terra Energy LLC to carry out overburden removal, to exploit coal and to provide engineering services for Baruun Noyon Mountain coal mine project, and it has been operating in collaboration with the project owner - Terra Energy LLC, to implement the project within a period of 5 years since September of 2012. Since the commencement of the project, our company has been operating in compliance with international standards of occupational safety and health and carried out about 2.5 million cubic meter overburden removal by employing advanced technology with minimum adverse effects on human and the environment.

There are over 80 employees of Grand Power LLC who are working for implementation of Baruun Noyon mine project. These include a mineral engineer, mineral surveyor, heavy-duty mining equipment trainer, mineral master, safety superintendent, environmental officer, human resource officer, equipment operators and mining assistants.

Our collectives include a team of professionals who have 5-10 years of experience in working at major national and western mining companies to make their contributions to the development.

CONSTRUCTION

alt text
  • Industrial and civil building
  • Indoor and outdoor pipeline and facilities
  • Construction of underground tunnel, and fabricated, reinforced and concrete steel structure building
  • Construction and maintenance of autoroad and road facilities
  • Manufacturing of pre-cast concrete construction material

Our approach

Our construction, technical and drawing engineers have an experience that constructed pioneer Coal Processing Plants in Mongolia. We offer all kind of services in each step of a project; from its commencement to the commissioning of the industry plant.

  • In 2005, we implemented Turnkey project of 200kWh Coal Gas Station in cooperation with Energy Research and Development Center under the Ministry of Energy.
  • In 2008, we has constructed Smokeless Fuel Plant for Sharyn Gol Energy LLC as well as made procurement of main technology equipment.
  • In 2009, we installed 2km long belt conveyor of Lignite Drying Plant in the Shivee-Ovoo coalmine.
  • In 2012, we constructed the first phase of Coal Dry Handling Plant of 9,6 million tpa in Ovoot Tolgoi Coal Mine.
  • In 2014, GP built Precast Concrete Fabrication Plant by turnkey condition.
  • From 2015, GP has been constructing European style, 3 store “Grand Village” Townhouse Complex for 119 households in 12th khoroo, Khan-Uul District, Ulaanbaatar city.

Our capability

Our company is capable of conducting following construction works and holds relevant licenses.

  • Pouring and installed steel concrete, concrete structure, complex pouring structure (level 1 to 16) construction. Steel structural erection (space is up to 18m, column height is up to 6m)
  • Construction of paved road and hard road
  • Construction of underground tunnel building with steel structural, pouring and installing concretes for special purpose
  • Building interior lighting, power supply Installation, outside building pipeline installation
  • Installation of building Interior lighting, electricity supply communication, network, fire protection and fire alarm system its instruments and outside building pipelines
  • Equipment installation of gas supply facilities
  • Installation, maintenance, technical service of lifting crane, other various lift (construction lift, handler, basket lift)

EQUIPMENT INSTALLATION AND ADJUSTMENT

alt text

We supply equipment that satisty international quality standards and provide erection and installation services. We do following services in the workshop that locates in suburb area of Ulaanbaatar city.

  • Power and renewable energy generators, electrical transmission lines, substations.
  • Maintenance and assembling of mining machineries and excavators.
  • Maintenance, adjustment and erection of industrial electric and mechanical equipment, heading vessels, boilers and pipeline.

Our approach

  • In 2000, we did maintenances for mining machineries and excavators and made adjustments for precision measuring instruments, automatics cooperating with Wostsibenergyugoli of Irkutsk, Russia and Siemens of Germany.
  • In 2000 – 2002, we changed barely all oil circuit breakers by vacuum breakers for Energy and Mining field of Mongolia.
  • In 2000-2004, our engineering team adjusted electric systems of shovel excavators and draglines such as ESh-25/90, ESh -20/90, ESh -15/90, ESh-13/50, ESh -10/70, EKG-101, EKG-81, EKG-4U, EKG-5А. Also we assembled drilling machine 200-60 and EKG shovel excavator, which were out of service and adjusted monitoring of Komatsu HD-325 dump truck from scratch and assembled and adjusted electric system of E-2509 shovel excavator in Talbulag coalmine.
  • In 2002, we installed and constructed the coal handling plant, substation of 110/35kV, fuel storage tank in frame of Baganuur and Shivee-Ovoo coal mine development project.
  • In 2005, we installed 30km long high voltage transmission lines and 35/6kV Substation upon request Shivee-Ovoo coalmine and Toson Alt LLC.
  • In 2006, we worked as main constructor of 100kWh wind power generator in Erdenetsagaan soum, Sukhbaatar Province of Mongolia.
  • In 2009, we supplied and installed distribution facility of 6.3kV for steam turbine generator in Erdenet city.
  • In 2010-2011, our engineering team assembled and tested operation of two sets of 495HR electric excavators of Bucyrus Central Asia LLC to Oyu Tolgoi project within 108 working days. Those excavators are the biggest excavator in Mongolia currently and have capacity to excavate 105tons of materials, to Dig 30-60m long well, to lift up 10,05m high, to transect in 18,4m high and to load 1304 tons of material.
  • In 2013, we did refurbishment and installation of monitoring system of bridge crane.
  • In 2013, we provided and installed roller crusher and feeder to the Lignite Drying Plant of Shivee-Ovoo coal mine.
  • In 2013-2015, Mongolian engineers assembled own designed electrical shovel excavator GP5A.

Our capability

Our company has follwoing licenses to conduct businesses.

  • Installation, Erection, Maintenance and Service of power generators in the range of capacity 0.1-5 MW.
  • Installation, Erection, Maintenance and Service of electricity transmission lines and substations with 0.4-35 kV.
  • Maintenance, Installation, Adjustment and Service of pressurized boilers of 0.7-40.0 kgf/cm².
  • Maintenance, Installation, Adjustment and Service of pressurized pipelines of 0.7-40.0 kgf/cm² and Central Heating System.
  • Maintenance, Installation, Adjustment and Service of pressurized vessels of 0.7-40.0 kgf/cm².
  • Maintenance, Installation, Adjustment and Service of facilities of under 40.0 kgf/cm².
  • Equipment installation of gas supply facilities
  • Installation, maintenance, technical service of lifting crane, other various lift (construction lift, handler, basket lift)

The Maintenance Workshop has following facilities:

  • Assembling hall for excavators and machineries that equipped with 32 tons of lifting capacity of bridge crane
  • Metal structure fabrication workshop
  • Storages of spare parts, materials and utilities
  • Camp for staff labors and cafeteria
  • Office rooms and meeting room

COAL PROCESSING PLANTS

alt text

Our team not only conducts Engineering Designs, Construction Drawings, Feasibility Studies of following Coal Conversion Plants, but also does project management, procurement, test and adjustment and commissioning, based on the last 10 years’ solid experience.

  • Coal Gasitication Plant
  • Semi-Coke and Smokeless Fuel Plant
  • Metallurgical Coke Plant
  • Lignite Drying Plant
  • Coal Washing Plant
  • Technological facilities of Gas Supply Networks

Our approach

  • In 2005, we implemented turnkey project of Coal Gas Station of 200kWh in cooperation with Energy Research and Development Center of the Ministry of Energy.
  • In 2006, The Coal Gas Station had been shifted to the Bukhmuron soum, Uvs Province to provide 200 households that hadn’t connected to Central Electricity System.
  • In 2007, 2008 we developed Feasibility Study of Smokeless Fuel Plant of 50,000tpa upon request of Sharyn Gol Energy LLC and provided consulting on project phases of initiation, procurement, engineering, construction, testing and commissioning.
  • In 2009, we initiated Lignite Drying Plant project of 1million tpa in Shivee-Ovoo coalmine and successfully installed 2km long belt conveyor on the coalmine site.
  • 2012, we constructed the first section of Coal Dry Handling Plant of 9,6million tpa in Ovoot Tolgoi Coal Mine. The project management was managed by Australia and U.S cooperated Ausenco Taggart Company.
  • In 2014, we built Coal Gas Plant for own consumption of gas to suplly heat and to make technology test for various types of coal.
  • In 2015-2016, we built 3.5km long gas pipeline from GP Coal Gas Plant to the enterprises’ heat only boilers to reduce raw coal consumption that enables air pollution reduction.

METAL FABRICATION SHOP

alt text
  • Fabrication of structural steel by plasma cutting and lathe tooth rear sprockets
  • Manufacturing of Industrial equipment and spare parts

Our approach

We have manufactured following structures in last operational years.

  • Excavator bucket
  • Excavator metal structures
  • 100 m long heading rail of roof concrete slab
  • Vibrating tables of concrete wall casting
  • Steel structures of window workshop, restaurant and coal gas plant
  • Water drawing pipeline of building
  • Clutch cover of cesspool and well
  • Intermediate platform
  • Crane rail
  • Water tank
  • Bunker platform
  • Caravan
  • Mobile light tower

Our capability

The Metal fabrication workshop has equipped with small and big size lathe machines, steel sheet rolling machine, hydropressor of 6300kH and electrical hoist, shear machine, hydropumps that could fabricate all types of metal structures and tooth rears. Also it’s possible to maintain mining machineries and parts.

Our professional welders shear steel sheets with 3-50mm thickness and do gas welding on high quality level.

CONSULTING SERVICE

alt text
  • Feasibility Study and Pre-Feasibility Study of Coal Processing Plants
  • Business Plan, Screening Study of Technology Selection and Procurement
  • Marketing Research Study

We not only draft Feasibility Study Report, but also could be responsible for project management, procurement, monitoring, commissioning and turn-key implementation of small to medium scale projects. Our engineering team is specialized to do testing and commissioning coal processing plants regarding to related regulations and standards of Mongolia.

We support you to make business decisions of the project implementation, based on the distinction of the coal deposit, coal characteristics, coal reserve, resource application ranges and product market capacity. Moreover, our engineers and technicians do drawings of construction buildings, equipment foundations and heating system, make adjustments to the construction drawings that executed by foreign companies to match in Mongolian Construction Codes and Standards.

Our approach

  • In 2005, Feasibility Study of Coal Gas Station in cooperation with Energy R&D Center.
  • In 2007-2008, Feasibility Study of Smokeless Fuel Plant for Sharyn Gol Energy and Huldyn Nuurs LLC with capacity 50,000 tpa and 100,000 tpa.
  • In 2008, research on Standards of Renewable Energy Utilization and Screening Analysis of Coal Washing Technologies in the frame of “Improvement of Energy Efficiency” project by German Technical Cooperation Association.
  • In 2009, Feasibility Study of Lignite Processing Plant and 2km long conveyor in Shivee-Ovoo Coalmine.
  • In 2009, Technology Selection and Procurement of Semi-Coke Plant of 75,000tpa for MAK LLC.
  • In 2011, Feasibility Study of Coal to SNG pant in cooperation with KBR of USA and Wuhan Engineering Corporation of China.
  • In 2011, Feasibility Study of Coal Handling Plant with annual capacity of 9.6 million tons of ROM coal for South Gobi Sands Coalmine, and translation of construction drawings and convertion to Mongolian Standards and Codes.
  • In 2013, Feasibility Study of Coal Washing Plant of 20million tpa for Erdenes Tavan Tolgoi JSC, cooperating with Ausenco Taggart Inc, Australia.
  • In 2013, Feasibility Study of Coal Washing Plant of 1 million tpa for Baganuur Coal Mine.
  • In 2015, Feasibility Study of Coking Coal Washing Plant in Tavan Tolgoi deposit with technology owner “Tangshan Guohua” LLC.

Our capabililty

The feasibility study, that proves your business idea would be profitable and feasible is crucial. We believe that well-processed business plan is a key of your business success. Our R&D team develop the feasibility study of projects based on the reliable information and raw material analysis conducted by the qualified laboratories, accordingly conduct a market analysis of final product, based on primary or secondary data.

Our company owns following patents in Mongolia:

  • Coal gas station
  • Production of syngas from coal
  • Smokeless fuel plant with combined heating plant
  • Running inner combustion enginer by coal syngas
  • Production of liquid fuel from coal
  • Combined power plant
worker

Our company operates in several sectors of Mining, Mineral Processing, Power Generation, Installation and Supply of energy facilities, Installation and Adjustment of Technology Equipment, Construction of Infrastructure and Industrial Building, and Consulting Services.